Journal Bina Rumah Sendiri

paka bate merah bos. pernah duk rmh bata simen. panas gile.

ibs jgn bt. berisiko.
 
menarikkk..
terima kasih tt sbb wujudkn thread ni..
 
bru lepas abes 1st meeting dgn arkitek & consultant diskas psl layout, keluasan, pattern, bajet & dll...
pd permulaan saye target 2800sqft saje tapi agak kecik utk tanah lot banglo 9000sqft..so hasilnye saye request kt die suh buat dlm range 4000sqft banglo 2 tingkat..

roughly bajet saye kire amek purata harge kontraktor buat..
4000sqft x rm130 = rm520,000

wah mahalnye..lari dr bajet saye rm400k..
ok skang saye amek average keuntungan pemaju dlm post saye sblm ni (40% tapi saye target sket je dlm 30%)

roughly estimate cost = rm520k
30% target save cost = rm520k x 30% = rm156k
actual cost = rm520k - rm156k = rm364k

bajet/loan rm400k - rm364k = rm36k

balance loan = rm36k (bleh wat interior, kos elektrik, kos piping)

saya rasa RM130 per sqft tu dah kira average cost dah tu
kalau boleh jimat lagi memang terbaik TT

tanah lot TT tu atas nama sapa?
 
ok dh tu. tk ssh sebenarnyer nak b pelan ni. mudah amat2. dulu aku ambik upah bt structure drawing dlm rm700-rm1000 jer klu rmh banglo. bos aku klu member2 die nak. die bg free jer. aku yg bt. jilake.~X(

Smlm arkitek tu ckp die amek rm1.50 per sqft..so murah la
 
brapa bilik, brapa toilet TT?

kalau ikut size kebiasaan

rumah teres yg berkeluasan 1,800 - 2,200 sqft
boleh dapat 4 bilik + 3 bilik air (ada jgk 4 bilik air)

rumah TT 4,000 sqft
itu size standard rumah banglo
boleh dapat 5 - 6 bilik tidur
 