BISMILLAH
With reference to the above-mentioned, we would like to take your kind attention that we
have been authorized to sell the above commodity based on the specification below by a
substantial global Merchandising and one of the leading Palm Olein CP8. Herewith are the
details for your perusal.
1. PRODUCT SPECIFICATION (As Per PORAM)
a. Type: RB OLEIN CP8
b. Free Fatty Acid (As Palmitic)
Method : AOCS Ca 5a-40
Result : 0.1% Max
c. Moisture & Impurities (%)
Method : PORUM 2.1 & 2.2
Result : 0.1% Max
d. Iodine Value (WIJS)
Method : AOCS Cd 16-92
Result : 6Min
e. Slip Melting Point (Degree)
Method : AOCS Ca 3-25
Result : 24oC Max
f. Colour
Method : OCS Ca 13a-92
Result : 3 Red Max
2. ORDER QUANTITY
- Min. Two Hundred Thousand Metric Ton (200,000Mt)
3. CONTRACT PERIOD :TBA.
4. PACKAGING :Bulk
5. PRODUCT ORIGIN : Malaysia
6. DURATION OF DELIVERY
-Approximately (+/-) thirty (30) Days AFTER validation and confirmation of Bank documentary
Letter of Credit. The duration specified is inclusive of time of goods shipment.
7. PORT OF DELIVERY
- TBA (Any safe world Port INCOTERM 2000 – ICC600)
8. SALES PRICE (F.O.B)
-(as per market current price)
9. MODE OF PAYMENT
a) Product Booking/Deposit: One Percent of Purchase Order.
b) Full balance by Bank Documentary: Bank Draft/ Letter of Credit or Standby Letter of
Credit (SBLC)
10. TERMS & CONDITIONS
a) Full Corporate Offer and Draft Contract to initiate the Agreement will only be issued
upon acknowledging and signing this Offer/ Quote letter.
b) All documentation pertaining to the sales/booking, commodity availability, shipping
dates, export license will only be issued within Ten (10) working days or whichever comes
first AFTER payment of Product
Booking and also verification and authentication of buyer’s Bank Documentary Letter of
Credit (LC).
c) Upon signing the Memorandum of Agreement, Buyer to issue and submit to Seller the LC
within Five (5) working days, failing to do so the Agreement is considered Null and Void.
Any initial/deposit or any payment received is NOT transferable to any other work load or
assignment. Any cancellation or termination of contract due to any delay after preparing
documentations and order submission will be dealt with 50% penalty being a non-performance.
d) Memorandum of Agreement (MOA) is subjected to the final details/ Invoices or of sales
contract. Goods payable by Bank documentary Letter of Credit issued must be (Transferable,
Divertible, Revocable, Negotiable and Confirm to cover 100% of the Purchase Price.)
Due to the global demand on Palm-oil and fluctuation of the desired currency (us$/RM);
This proffer is current active and valid only for every Five (5) days
contact me directly at
[email protected].
Thank you.