JAYPB
Active+ Member
- Messages
- 3,545
- Joined
- Jul 31, 2009
- Messages
- 3,545
- Reaction score
- 5
- Points
- 25
BARU LANCAR..
PLAN PEMASARAN SITTIN NETWORK
A. PLAN EKSEKUTIF
i. Modal = RM110(WM) / RM120(EM) Perunit.
ii. Produk = 1 set minyak wangi(5 botol) ‘Sittin Perfume’.
iii. Had maksimum belian individu = 10 unit sahaja.
iv. Bonus Jualan Langsung(Direct Sponsor) = RM15 perunit.
v. Maksimum Direct line = 10 unit sahaja. Selebihnya akan placement ke bawah.
vi. Unilevel bonus (4 Level):
Level 1 = RM 5.00
Level 2 = RM 5.00
Level 3 = RM 5.00
Level 4 = RM10.00
Contoh kiraan Bonus Unilevel:
LEVEL 1 = 10 Unit X RM 5 = RM 50.00
LEVEL 2 = 100 X RM 5 = RM 500.00
LEVEL 3 = 1000 X RM 5 = RM 5,000.00
LEVEL 4 = 10000 X RM10 = RM100,000.00
------------------
Jumlah = RM105,550.00
------------------
$ Setiap bayaran bonus akan ditolak 10% untuk Automaintain(RM100/RM110)
Ahli akan dapat bayaran penuh selepas selesai potongan Automaintain.
$ Setiap Automaintain akan dapat lagi 1 set Sittin Perfume dan 1 unit Re-entry
dalam Plan Hibah.
$ Kiraan Bonus bagi setiap kemasukan unit pada setiap level(kiraan harian)
akan dimasukkan ke dalam e-wallet peserta.
$ Bayaran bonus seminggu sekali dalam bentuk Cek/ke akaun bank
peserta.
B. PLAN HIBAH
i. Unit2 Hibah akan dikongsikan samarata kepada semua ahli Aktif/Pasif.
ii. Sistem matrix 3 x 3 x 2 Level.
iii. Jadual Agihan Plan Hibah:-
FASA 1
FASA 2 FASA 3 FASA 4
RM100.00
RM200.00
RM1000.00
RM12,000.00
JUMLAH HIBAH DITERIMA AHLI(F1+F2+F3+F4) = RM13,300.00
• Setiap bayaran unit hibah akan di potong 10% bermula Fasa 2 sebagai sumbangan ahli untuk melajukan lagi Plan Hibah.
C. STOKIS MOBILE
i. Modal = RM2150.00 (20 set x RM107.50/unit + Hadiah 1 set) – WM
ii. Modal = RM2350.00 (20 set x RM117.50/unit + Hadiah 1 set) – EM
D. LAIN-LAIN INSENTIF
i. Hadiah2 Misteri Untuk Leader.
ii. Cabutan Bertuah.
iii. Pakej Pelancongan.
iv. Khairat Kematian
www.sittin2u.com
“Transformasi Pengguna Alaf Baru…..”
“Anda Berbelanja, Keuntungan Dikongsi Bersama”
Terima Kasih!!!
Admin
PENGIRAAN PLAN HIBAH
FASA 1
*Sumbangan Hibah drp Sittin= RM20.00
*Pecahan Hibah dlm Sistem Unit matrix= 3 x 3 x 2 Level.
Level 1 = 3 x RM 3 = RM 9
Level 2 = 9 x RM17 = RM 153
----------------------------
Jum.Kasar = RM 162
-RM 62 (Hibah ke Fasa 2)
Baki Bersih Hibah Utk U = RM 100.00
FASA 2
*Sumbangan Hibah drp Fasa 1= RM62.00
*Pecahan Hibah dlm Sistem Unit matrix= 3 x 3 x 2 Level.
Level 1 = 3 x RM 10 = RM 30
Level 2 = 9 x RM 52 = RM 468
----------------------------
Jum.Kasar = RM498
-RM298 (Hibah ke Fasa 3)
Pulangan Hibah Utk U =RM 200.00 (-10% sumbangan balik Fasa 1)
Baki Bersih Hibah Utk U = RM 180.00
FASA 3
*Sumbangan Hibah drp Fasa 2= RM298.00
*Pecahan Hibah dlm Sistem Unit matrix= 3 x 3 x 2 Level.
Level 1 = 3 x RM 40 = RM 120
Level 2 = 9 x RM258 = RM 2322
--------------------------------
Jum.Kasar = RM 2442
-RM 1442 (Hibah ke Fasa 4)
Pulangan Hibah Utk U =RM1000.00 (-10% sumbangan balik Fasa 1)
Baki Bersih Hibah Utk U = RM 900.00
FASA 4
*Sumbangan Hibah drp Fasa 3= RM1442.00
*Pecahan Hibah dlm Sistem Unit matrix= 3 x 3 x 2 Level.
Level 1 = 3 x RM 142 = RM 426
Level 2 = 9 x RM1300 = RM 11,700
-----------------------------------
Jum.Kasar = RM12,126
-RM 126 (Pengurusan Sittin)
Pulangan Hibah Utk U =RM12,000. (-10% sumbangan balik Fasa 1)
Baki Bersih Hibah Utk U = RM 10,800.00
JUMLAH KASAR PULANGAN HIBAH AHLI(F1+F2+F3+F4) = RM13,300.00
JUMLAH BERSIH PULANGAN HIBAH AHLI(F1+F2+F3+F4)= RM11,980.00
www.sittin2u.com
0194149162
PLAN PEMASARAN SITTIN NETWORK
A. PLAN EKSEKUTIF
i. Modal = RM110(WM) / RM120(EM) Perunit.
ii. Produk = 1 set minyak wangi(5 botol) ‘Sittin Perfume’.
iii. Had maksimum belian individu = 10 unit sahaja.
iv. Bonus Jualan Langsung(Direct Sponsor) = RM15 perunit.
v. Maksimum Direct line = 10 unit sahaja. Selebihnya akan placement ke bawah.
vi. Unilevel bonus (4 Level):
Level 1 = RM 5.00
Level 2 = RM 5.00
Level 3 = RM 5.00
Level 4 = RM10.00
Contoh kiraan Bonus Unilevel:
LEVEL 1 = 10 Unit X RM 5 = RM 50.00
LEVEL 2 = 100 X RM 5 = RM 500.00
LEVEL 3 = 1000 X RM 5 = RM 5,000.00
LEVEL 4 = 10000 X RM10 = RM100,000.00
------------------
Jumlah = RM105,550.00
------------------
$ Setiap bayaran bonus akan ditolak 10% untuk Automaintain(RM100/RM110)
Ahli akan dapat bayaran penuh selepas selesai potongan Automaintain.
$ Setiap Automaintain akan dapat lagi 1 set Sittin Perfume dan 1 unit Re-entry
dalam Plan Hibah.
$ Kiraan Bonus bagi setiap kemasukan unit pada setiap level(kiraan harian)
akan dimasukkan ke dalam e-wallet peserta.
$ Bayaran bonus seminggu sekali dalam bentuk Cek/ke akaun bank
peserta.
B. PLAN HIBAH
i. Unit2 Hibah akan dikongsikan samarata kepada semua ahli Aktif/Pasif.
ii. Sistem matrix 3 x 3 x 2 Level.
iii. Jadual Agihan Plan Hibah:-
FASA 1
FASA 2 FASA 3 FASA 4
RM100.00
RM200.00
RM1000.00
RM12,000.00
JUMLAH HIBAH DITERIMA AHLI(F1+F2+F3+F4) = RM13,300.00
• Setiap bayaran unit hibah akan di potong 10% bermula Fasa 2 sebagai sumbangan ahli untuk melajukan lagi Plan Hibah.
C. STOKIS MOBILE
i. Modal = RM2150.00 (20 set x RM107.50/unit + Hadiah 1 set) – WM
ii. Modal = RM2350.00 (20 set x RM117.50/unit + Hadiah 1 set) – EM
D. LAIN-LAIN INSENTIF
i. Hadiah2 Misteri Untuk Leader.
ii. Cabutan Bertuah.
iii. Pakej Pelancongan.
iv. Khairat Kematian
www.sittin2u.com
“Transformasi Pengguna Alaf Baru…..”
“Anda Berbelanja, Keuntungan Dikongsi Bersama”
Terima Kasih!!!
Admin
PENGIRAAN PLAN HIBAH
FASA 1
*Sumbangan Hibah drp Sittin= RM20.00
*Pecahan Hibah dlm Sistem Unit matrix= 3 x 3 x 2 Level.
Level 1 = 3 x RM 3 = RM 9
Level 2 = 9 x RM17 = RM 153
----------------------------
Jum.Kasar = RM 162
-RM 62 (Hibah ke Fasa 2)
Baki Bersih Hibah Utk U = RM 100.00
FASA 2
*Sumbangan Hibah drp Fasa 1= RM62.00
*Pecahan Hibah dlm Sistem Unit matrix= 3 x 3 x 2 Level.
Level 1 = 3 x RM 10 = RM 30
Level 2 = 9 x RM 52 = RM 468
----------------------------
Jum.Kasar = RM498
-RM298 (Hibah ke Fasa 3)
Pulangan Hibah Utk U =RM 200.00 (-10% sumbangan balik Fasa 1)
Baki Bersih Hibah Utk U = RM 180.00
FASA 3
*Sumbangan Hibah drp Fasa 2= RM298.00
*Pecahan Hibah dlm Sistem Unit matrix= 3 x 3 x 2 Level.
Level 1 = 3 x RM 40 = RM 120
Level 2 = 9 x RM258 = RM 2322
--------------------------------
Jum.Kasar = RM 2442
-RM 1442 (Hibah ke Fasa 4)
Pulangan Hibah Utk U =RM1000.00 (-10% sumbangan balik Fasa 1)
Baki Bersih Hibah Utk U = RM 900.00
FASA 4
*Sumbangan Hibah drp Fasa 3= RM1442.00
*Pecahan Hibah dlm Sistem Unit matrix= 3 x 3 x 2 Level.
Level 1 = 3 x RM 142 = RM 426
Level 2 = 9 x RM1300 = RM 11,700
-----------------------------------
Jum.Kasar = RM12,126
-RM 126 (Pengurusan Sittin)
Pulangan Hibah Utk U =RM12,000. (-10% sumbangan balik Fasa 1)
Baki Bersih Hibah Utk U = RM 10,800.00
JUMLAH KASAR PULANGAN HIBAH AHLI(F1+F2+F3+F4) = RM13,300.00
JUMLAH BERSIH PULANGAN HIBAH AHLI(F1+F2+F3+F4)= RM11,980.00
www.sittin2u.com
0194149162