ni land area ke built up area TT?
semi-d biasanya land area 3,200sqft. tanah area situ, RM40-RM45/sqft.
RM45 x 3,200sqft = RM144,000
RM775k -RM144k = RM631k
assuming
legal fee = RM5,000
stamping = RM8,000
others = RM2,000
total = RM15,000
building = RM631k - RM15k = RM616k
assuming margin 40%. kos = RM616k x 60% = RM369,600/2,502sqft = RM147.72/sqft.
RM147.72/sqft / 1.05 (5% untuk consultant, macam arkitek, jurutera bagai) = RM140.69/sqft.
reasonablela kot, considering TT dah letak memacam dalam rumah tu, rasanyalah.